Published October 25, 2026.
A five-day onboarding plan for calendar support: read the rules, shadow real work, draft changes, reverse-shadow, and earn live access with evidence.
Day one: read the rules before touching the calendar
Give the new assistant the source map, the event-class matrix, the timezone rule, and three examples of changes that were handled well. Ask them to explain the difference between a proposal and a committed meeting before they receive edit access. The first day should produce questions, not calendar changes.
Have them map the systems they can see: the principal’s calendar, the planning view, the travel schedule, and the assistant queue. They should identify which system is authoritative and which person owns each event class. End the day with a short written summary so the reviewer can catch a misunderstanding early.
Day two: shadow and annotate real work
The assistant watches the owner handle live requests but does not act. They annotate each request with the requester, the event class, the decision needed, the source checked, and the proposed response. The owner reviews the annotations at the end of the day and corrects the reasoning, not only the final answer.
Include at least one declined request and one conflict. A new assistant needs to see how the team says no, how a double-booking is resolved, and what happens when a senior requester pushes back. Shadowing only easy approvals teaches the wrong lesson.
Day three: draft changes in a safe copy
Ask the assistant to prepare five changes in a test calendar or a clearly labeled draft view. Cover a routine internal move, a recurring-series exception, a timezone change, a meeting with an external attendee, and a request that should be declined. The reviewer checks the source, the authority, the attendee impact, and the notification plan.
Do not let a correct final time hide a weak process. A draft that reaches the right answer by guessing still fails. Require the assistant to state which rule applied and where they would stop if the rule did not fit.
Day four: reverse-shadow with limited live access
The assistant makes approved changes while the owner watches the same screen. Start with low-consequence internal meetings and a named reviewer. The owner checks the authoritative calendar after each change and confirms that the old state, new state, and attendee notification are all correct.
Increase scope only after a clean sample. If the assistant misses a conflict, do not simply correct the calendar; identify whether the source map, the event matrix, or the review step was unclear. The first week is for repairing the brief, not for measuring speed.
Day five: review evidence and set the go-live boundary
Close the week with a short evidence review: the changes made, the questions asked, the errors found, the rules that needed clarification, and the access still held. Decide which event classes can move into the standard lane, which stay gated, and which require a second reviewer. Set a 30-day review date.
Give the assistant a one-page reference with the authoritative calendar, the stop conditions, and the escalation names. Remove test access that is no longer needed. The goal is not a fully independent assistant on day five; it is a bounded lane with evidence that the next expansion will be safe.